For project managers & project developers

Run every project like it's your only one

You're the one holding it together, across sites, subcontractors, and a hundred moving parts. GroundBrain puts the whole project in one place, so you can see what's coming, chase what's slipping, and prove what happened.

The PM's week

Managing the project, or fighting the fire?

You get a weekly report, but not the one thing you need: what's about to go wrong next week. So the job becomes chasing people, re-reading threads, and proving what was agreed, instead of doing your job.

01

You find out next week's problem next week

No look-ahead. The material shortfall, the no-show subcontractor, the task running behind.

02

Chasing subcontractors for proof

"They say yes and do no." You wait weeks for the photos and updates you asked for.

03

Punch lists cleared on foot

Open items tracked in an Excel sheet, closed only by physically walking a 10-acre field to check each one. And you can't give this task to anyone else.

04

"How did we agree it again?"

Three months into a build, the detail you settled with a subcontractor is buried in email.

Your capacity is the ceiling

To take on another project, you'd have to hire another you.

Built around your week

See ahead, coordinate, report

Look ahead a week

Surface next week's risks before they hit: a material shortfall, a shaky subcontractor confirmation, a task running below the rate it needs to hold the schedule.

Coordinate your subcontractors

Give each subcontractor role-based access to upload their scope's evidence: photos, sign-offs and updates. Proof lands in time, in one place, not in your inbox.

Reports that write themselves

Weekly updates for HQ, investors and banks: state of construction, delivery issues, open items. Compiled from the project record, not rebuilt by hand.

Run more projects without hiring another you.

"
It's the layer between us and our subcontractors that was always missing.
PL
Project lead
Solar EPC
Ask the project brain

Your delay exposure, in seconds.

Every contract, email, WhatsApp thread and journal in one place. Ask in plain words; get a straight answer, every figure cited, and the decision captured for next time.

Every figure cites the exact clause or message
The system learns more as you accept answers
No reading a 120-page contract mid-delay
AskCompileDecisionsSources
What's my exposure if we slip the project by 2 weeks?
Contract & commercial
Short answer

A two-week slip past the Time for Completion costs you €259,000 in delay damages. That is 14 days × €18,500 per calendar day (Clause 14.3 6). Deductible from any sum otherwise due, or callable on the performance bond, without further notice (Clause 14.4 6).

But that headline only applies if the slip lands on M7. Where the two weeks lands changes the answer completely…

Accepted
26 Decision · 2026-08-07
Serve Clause 21.2 notice for Westnetz substation delay by 20 July 2026

NorthArc must issue a Clause 21.2 delay notice to the Employer for the Westnetz substation back-energisation slip.

Compile

Handover packs & punch lists, built as you walk

Pull a template, walk the site once, and attach the evidence each item needs. Photos, test records, certificates, a journal note.

Create templates for HSE walks, QA sign-off, client walkrounds or anything else you need
Clear open items with photo proof yourself, or let your contractors provide evidence in-app
Automate repeated reports, create alerts, distribute to relevant contacts
AskCompileDecisionsSources
Pre-energisation checklist · B4 Sign & distributeFill in
1. AC and DC isolators locked off, keys heldPhotoSignature
2. String IV tests within 3% of designTest record
3. Mid-clamp torque records complete for B4Journal recordPhoto
4. Earthing continuity tested across B4Test record
5. Inverter firmware signed off for G99Certificate
6. DNO witness permit in dateDocument
"
Our best site manager is everywhere at once. The one thing he doesn't have is time, so I end up chasing him for information, every time.
PD
Project developer
Solar EPC
Early access

Put your next project on GroundBrain

We're refining the product with a small group of owners, EPCs and subcontractors. Bring a real project and a real deadline. We'll set it up with you in a workshop.